Phase 1: Isolation and First Fix Works

The first stage of the project involved isolating the building from the mains water connection. This ensured that all existing pipework was safely removed or capped, making the site ready for new installation works.

Once isolated, our engineers completed the full first fix for:

  • Hot and cold domestic water supplies

  • Heating pipework to radiators and plant equipment

  • Drainage and waste pipe routes

  • Pipework routes to all sanitaryware locations

All pipework was carefully set out and pressure tested to ensure optimal performance before walls and floors were closed up. Working closely with the site team and main contractor meant we were able to coordinate installation routes efficiently and maintain programme targets.


Phase 2: Second Fix & Plantroom Installation

After finishes were completed, we returned to carry out the second fix stage. This included installing:

  • All sanitaryware (WCs, basins, showers, and kitchen fixtures)

  • Brassware including taps, thermostatic shower mixers, and isolation valves

  • Plantroom equipment, boilers, pumps and associated controls

Attention to detail is critical during this phase. Every fixture was levelled, sealed, tested and commissioned to ensure reliable operation and a high-quality finish for the client.